Construction Gallery - Las Vegas, Nevada.
Sept. 22-25, 2002 photographs by Kim Pedersen.


Here we can see the first emergency walkway has been installed between dual guideway.


Here's the emergency walkway from below.


The crossover switch uses technology very similar to that of Jacksonville's monorail, yet features the slender M-VI beamways.


The same switch platform, as viewed from the Sahara parking lot structure. To the left is the Sahara Station.


While we visited, pieces were being lifted into place quickly. Note how far the Sahara Station is cantilevered over Paradise Road.

There's more! Sept 22-25 page 1 / 2 / 3 / 4 / 5 / 6

Previous Las Vegas construction pictures:
August 22,2002
August 5, 2002
July 10-12, 2002
June 27, 2002
June 7-18, 2002.
Late May 2002.
April May, 2002, tall columns.
May 3, 2002, beam manufacturing continues.
March 26, 2002, first dual-guideway beams up.
March 22-24, 2002, first look at t-supports.
January 16-17, 2002, first beam lifted into place.
January 2-3, 2002, columns and rebar.
December 2001 beam yard images.
October 2001 first pylons and track.
August 2001 ground breaking images