Construction Gallery - Las Vegas, Nevada.
April 5, 2003 - page two of three

The electronics panel inside the M-VI train.


A nice close look at the diesel-powered Monorail Recovery Vehicle (MRV)


Another first look! The system control room inside the OMSF.


Construction is in full swing at the Sahara Station.


The Sahara Station is beginning to really look like a monorail station.


Looking north from the Sahara Station, the OMSF spur to the right and future downtown extension track points north.


Track, conduit trays and emergency walkway as seen from below.

April 5, 2003 - Page One / Page Two / Page Three


Previous Las Vegas construction pictures:
March 27, 2003
February 23, 2003
February 5, 2003
January 21, 2003
November 16 , 2002
November 12, 2002
September 22-25.2002
August 22,2002
August 5, 2002
July 10-12, 2002
June 27, 2002
June 7-18, 2002.
Late May 2002.
April May, 2002, tall columns.
May 3, 2002, beam manufacturing continues.
March 26, 2002, first dual-guideway beams up.
March 22-24, 2002, first look at t-supports.
January 16-17, 2002, first beam lifted into place.
January 2-3, 2002, columns and rebar.
December 2001 beam yard images.
October 2001 first pylons and track.
August 2001 ground breaking images