Construction Gallery - Las Vegas,
Nevada.
April 5, 2003 - three of three
As long as were looking at emergency walkways and conduit trays,
here's what it looks like when the track splits for a station
(click here for our discussion
group).
The Hilton Station.
On the platform of the Hilton Station. Note that this is a center
platform station.
Near the Strip, the Flamingo Hilton Station starts to take shape.
That's Keith's limo waiting to take him to the next construction
area.
A nice s-curve over Flamingo Road between the Flamingo Hilton
and Bally's.
Track is approaching the Bally's building cut-through.
Meanwhile, the weathered track of the former MGM-Bally's Monorail
is prepped for upgrading and integration with new track to the
north. Thanks for the great pictures Keith!
April 5, 2003 - Page One / Page Two / Page Three
Previous Las Vegas construction pictures:
March 27, 2003
February 23, 2003
February 5, 2003
January 21, 2003
November 16 , 2002
November 12, 2002
September 22-25.2002
August 22,2002
August 5, 2002
July 10-12, 2002
June 27, 2002
June 7-18, 2002.
Late May 2002.
April May, 2002, tall columns.
May 3, 2002, beam manufacturing continues.
March 26, 2002, first dual-guideway beams
up.
March 22-24, 2002, first look at t-supports.
January 16-17, 2002, first beam lifted
into place.
January 2-3, 2002, columns and rebar.
December 2001 beam yard images.
October 2001 first pylons and track.
August 2001 ground breaking images